January 2024 – Project Update January 12, 2024 in Project Updates Click here to view the slides from the January 2024 NSBC Meeting Presentation. Installing pre welded pipes on hanger's and welding connections 2nd floor ramp from G to N building Installing cambia westside of G building N Building north wall elevation windows installation E building 3rd floor Science lab 7 (E-306) ceiling grid installation Load More...