January 2024 – Project Update

Click here to view the slides from the January 2024 NSBC Meeting Presentation.

Installing pre welded pipes on hanger's and welding connections 2nd floor ramp from G to N building
Installing cambia westside of G building
N Building north wall elevation windows installation
E building 3rd floor Science lab 7 (E-306) ceiling grid installation