March 2024 – Project Update

Click here to view the slides from the March 2024 NSBC Meeting Presentation.

Installing tiles in grid Second Floor E Building hallway
Insulating sheet rocking all rooms, hallways and stage auditorium
Running alarm M-C Second Floor F Building hallway, elevator area
Installing ductwork in ceiling of Auditorium